Odoo IntegratorDevelopment and integration

Services

Development, integration, and consulting for Odoo.

A project usually combines more than one of these. The first conversation names what belongs in the first release, and what waits.

01

Implementation

Stand up Odoo around the way the organization sells, buys, stocks, makes, and accounts for its work.

  • Process workshops with the people who do the work
  • Configuration of the standard applications in scope
  • A written definition of the first release

02

Adaptation and custom modules

Change Odoo where standard behavior would force a workaround the team will have to repeat. Keep the core upgradeable.

  • A written reason for every custom module
  • Development against a named Odoo version
  • Code kept outside core so upgrades stay possible

03

Integrations

Connect Odoo to the systems that must remain: payments, banks, storefronts, warehouses, or industry tools.

  • A list of systems, directions, and owners
  • A failure behavior: retry, log, and a person who is told
  • A test environment before live data is touched

04

Data migration

Move the records the new system needs on the first day, and rehearse the load before anyone depends on it.

  • Master data, opening balances, and open documents
  • Trial loads on a copy of the database
  • A reconciliation the business can sign

05

Training and support

Leave the team able to run the system, then stay close while the first real transactions land.

  • Role-based sessions on the configured database
  • Short written procedures for the risky steps
  • A named support window after go-live

06

Independent review

Read an Odoo project that is already underway: the scope, the custom code, the data, and the gap between the demo and daily work.

  • Findings ranked by what blocks go-live
  • What can stay, what should be removed, and what should wait
  • A sequence the current team can act on

How a project runs

  1. 01

    Understand the process

    Walk the process with the people who run it. Capture edition, version, integrations, and what the first release must include.

  2. 02

    Solution design

    Map the process onto standard Odoo, then list the adaptations, integrations, and data that the design depends on.

  3. 03

    Configure and build

    Configure the applications in scope and build only the custom work the design called for. Review it against the written boundary.

  4. 04

    Rehearse the data

    Load master data, opening balances, and open documents on a copy. Reconcile the figures before the cutover date is treated as real.

  5. 05

    Go-live and support

    Train by role on the configured system, then stay available while the first real transactions are posted and corrected.

Tell us what you need Odoo to run.

A first conversation is enough to see whether the work should be scoped. If it should, you receive a written scope before development is scheduled.

Start a conversation